Project: Mardi Gras pipeline system (BP)

HMC scope: Project Management, Engineering, fabrication and Offshore Installation of the Mardi Gras Export Pipelines (Ultra deep water, 2200m). The project comprised a total of 400-km of 28- inch, 26-inch, 24-inch, 18-inch and 16-inch pipelines with 13 Inline Wye-pieces, 5 Pipeline Termination Assemblies and 8 Steel Catenary Risers, Atlantis pipe-in-pipe SCR’s and flowlines.

FT scope: Pipeline fabrication engineering

Location: HMC HQ Leiden, the Netherlands and offshore Gulf of Mexico